Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1563-1567  
J. Environ. Treat. Tech.  
ISSN: 2309-1185  
Journal web link: http://www.jett.dormaj.com  
https://doi.org/10.47277/JETT/8(4)1567  
Maintenance Operations and its Management in  
Oil Industry in Kuwait  
1
2
Hesham Almomani *, Abdurahman Hamad Aldaihani  
1
Department of Industrial Engineering, Faculty of Engineering, the Hashemite University, Jordan  
2
MPW, Kuwait  
Received: 06/05/2020  
Accepted: 27/09/2020  
Published: 20/12/2020  
Abstract  
The maintenance in oil area need to undertake entire shutdowns together with generic refinery turn-around, unit shutdowns on a  
full accountability foundation and Scaffolding services. The in-house equipment and equipment: the in-house Maintenance workshop  
facility ought to be completely outfitted with lathe machines, shaping machine, hole spindle lathe machine, horizontal boring machine,  
radial drilling machine, pipe threading machine, valve lapping machine, mechanical seal lapping machine, welding computing  
device and all sorts of specialized warmness exchanger re-tubing gear and tools. Maintenance operations in this zone face  
many troubles in management, price and technical problems. This study aims to study the and count the failures occurred in equipments  
of Kuwait Oil Company (KOC) in 2019, and study the maintenance strategies used in petroleum industry in the Kuwait state, a  
maintenance programs or steps will be suggested and investigated in order to improve the maintenance operations. Availability of  
devices are calculated depending on downtime of the devices at KOC. The data were collected about failures frequency occurred for the  
KOC company equipments. Most of oil equipments have good availability but in the case of KOC four devices have availability less  
than 90% which means more failure and downtime, the company adopted a Zero S/D PM Strategy or Philosophy which decreasing  
failures by 75% and improve the availability of KOC devices. Planning and management of maintenance and monitoring operations in  
any company decreasing failure frequency of equipments and so downtime of equipments which improves the equipments availability.  
Keywords: Oil sector, Maintenance, Availability, KOC, Downtime and failures  
1
and calcareous areas as nicely as drilled wells and developed  
1
Introduction  
fields and produced oil and natural gas. The Kuwait National  
Petroleum Company used to be accountable for refining and  
manufacturing fuel and advertising the petroleum merchandise  
in the neighborhood market. The Petrochemical Industries  
Company performed the manufacturing and advertising of  
fertilizers and petrochemical products.  
The National Petroleum Company succeeded all through  
the yr 2010 in signing two contracts that are very 14 Sheikh  
Ahmed Al Abdullah and Ali Al Nahimi reducing the  
inauguration ribbon for the first stage of the Al Khafanji Field  
improvement vital with regard to herbal fuel for a complete  
price estimated at 373 million dinars. The first challenge was  
once signed with Dailem International Ltd for organizing the  
fourth fuel manufacturing line at the gasoline liquefaction plant  
of the Al Ahmedi Port refinery (Stevens, 2008; Al-Azmi,  
Oil grew to become the solely count on the minds of the  
Kuwaiti authorities and human beings since 1913. The first  
negotiations on Oil have been headed through Sheikh Mubarak  
Al Sabah and the British Consul General in the Gulf Sir Percy  
Cox. A sure duration of time surpassed and the Kuwait Oil  
Company used to be established. It commenced its works in  
Bahra area to the north from Joun Kuwait. The preliminary  
geological survey commenced with the drilling of the first  
exploratory nicely in 1936. However, this properly did no  
longer supply hopes for business production; therefore, the  
search persevered elsewhere. In 1938, in Burgan region,  
which was once the different site, the drilling operations led  
to discovering a sand nicely with oil at a depth of 3700 feet.  
Production exams confirmed that this website online was  
once noticeably encouraging. This nicely was once follows by  
using eight different wells drilled between 1938 and 1942 AD.  
Hopes for oil had been confirmed. Due to the Second World  
War, the manufacturing stopped till November 1945. The  
oil manufacturing was once resumed at a fee of thirty thousand  
barrels per day. Commercial shipments commenced in June  
2014). A number of different maintenance approaches, on  
occasion referred to as techniques or philosophies, are  
presently handy for utility in all manufacturing methods. The  
necessary traits of these upkeep strategies are pretty similar,  
however their focuses are different. Reliability-centered  
upkeep (RCM) originated in the aviation industry, and is  
centered on tools reliability (Tétreault, 1995). Total productive  
upkeep (TPM) originated in the meeting line industry, and is  
centered on enhancing the exceptional of humans and tactics  
1
946. The explorations developed and commercial enterprise  
thrived. The corporation brought to drilling and extraction new  
things to do such as refining crude oil and consequently its  
endeavor accelerated quite (Stevens, 2008; Al-Azmi, 2014).  
The Kuwait Petroleum Company grew to be the founding  
contributor in the International Organization for Power  
Development. During the equal year, (1980), the Kuwait Oil  
Company carried out exploration and survey operations in wild  
(
Tétreault, 1995). Business-centered protection originated in  
the procedure industry, and focuses on performing inexpensive  
preservation to acquire enterprise dreams (Brune, 2003).  
Maintenance of bodily property has been wanted ever due to  
Corresponding author: Hesham Almomani, Department of Industrial Engineering, Faculty of Engineering, The Hashemite University,  
E-mail: heshamalmomani@hu.edu.jo  
1563  
Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1563-1567  
the fact that human beings started out constructing them. The  
want for protection administration was once brought on via an  
expand in the number, size, and complexity of assets, and the  
extended specialization of protection duties to be performed.  
All upkeep tactics or techniques use a quantity of fundamental  
sorts or methods for every asset of the complete system.  
Alsharhan and Nairn (1997) mentioned the important strategies  
that can be utilized to the protection of the factors of a technical  
system. The 4 methods that are most frequently used are  
highlighted as follows: Operate to failure (OTF)  gear is run  
till a failure occurs, when a substitute is normally performed.  
This tactic is frequently the cheapest, on account that the full  
layout lifestyles of the thing is utilized. But it is now not proper  
exercise when the outcome of failure is severe, such as loss of  
lifestyles or a most important launch of detrimental substances.  
Time-based upkeep (TBM) alternative or cleansing is carried  
out at predetermined time or utilization intervals. This tactic is  
regularly used for easy aspects that show off a particular wear-  
out failure mode with a slender failure distribution. A downside  
is that solely phase of the beneficial existence of aspects is truly  
gadget graph challenges occur, mainly in heavy gear and  
distinct functions the usage of large ability direct power  
compressors used in oil industry.  
Telford et al (2011) explored the current literature on the  
improvement and purposes of CBM in the oil and fuel industry.  
The current literature reinforces the truth that the position of  
CBM is indispensable to the smooth, uninterrupted,  
environment friendly and protected jogging of oil and gasoline  
facilities. The complicated and built-in nature of the oil and fuel  
services require precise and carefully organized CBM packages  
with real-time situation monitoring statistics recording,  
analysis, and choice making to facilitate an correct grasp of the  
crucial preservation intervals. This in flip can promote  
optimized utilization of plant gear with greater stages of sure  
bet and safety.  
Many companies are investigating the broader  
implementation of automation to limit the range of personnel  
required and the dangers they are subjected to in a bid to  
enhance affectivity and minimize human error and risks. There  
is additionally an enlarge in un-manned facilities, mainly in far  
flung locations. These two traits will inevitably enlarge running  
costs. From an funding perspective, the uncertainty in furnish  
potential that buyers will be searching to low fee of  
manufacturing and renovation operations to make sure the  
protection of their funding (Treadgold, 2010) Due to these traits  
and challenges, oil and gasoline businesses are searching to  
optimize manufacturing (Elgsaeter et al., 2010) and enhance  
asset integrity administration (Rahim, 2010). A high-quality  
protection application is an integral and big aspect of operations  
with many benefits, including; the discount of downtime due to  
surprising tools failure, which improves reliability and  
maintainability, growing tools availability and utilization.  
Optimizing upkeep additionally improves the beneficial  
lifestyles of equipment. Proactive or preventative renovation  
utilized. Condition-based preservation (CBM)  
some  
parameter that shows the circumstance of the tools is measured  
constantly or periodically, and alternative is carried out when  
the circumstance is no longer acceptable. Fault-finding  
protection (FFM)  periodic tests are carried out to decide  
whether or not the back-up equipment, redundant equipment,  
or protecting gear is nonetheless wholly functional. If not,  
restore or alternative is carried out (Alsharhan and Nairn,  
1
997).  
2
Literature Review  
Many papers discussed in deep the maintenance operations  
in oil and gas plants. Elwerfalli and Munive (2016) explored  
the present literature on the improvement and functions of  
CBM in the oil and fuel industry. The latest literature reinforces  
the truth that the function of CBM is imperative to the smooth,  
uninterrupted, environment friendly and secure jogging of oil  
and fuel facilities. A new methodology for enhancing TAM  
scheduling of oil and fuel plant life used to be introduced by  
using Elwerfalli and Munive (2016).  
(
PM) techniques are a fundamental aspect of a superb  
renovation program.  
The PM method recognized as condition-based renovation  
(
CBM) presents a dynamic appreciation of gear situation whilst  
in operation and is used to predict failure in mechanical  
structures thru fault prognosis from circumstance monitoring  
indicators the usage of diagnostics and prognostics (Heng,  
If we limit downtimes and screw ups number, the reliability  
of the device will be expanded and so greater manufacturing  
low charges and extra reliability are achieved. Maintenance has  
many varieties and it can be preventive or predictive and it is  
aimed at making use of information of engineering and  
protection competencies to make sure multiplied overall  
performance and discount in their charge of failure.  
Furthermore, this protection ought to consist of periodic  
examination in phrases of ordinary stroll via to spot exchange  
in working conditions, sounds or temperature; it additionally  
consists of inspection programs, lubrications amongst others. A  
high quality preventive preservation application will assist pick  
out symptoms of gear that is about to fail. When accomplished  
in many instances base on the tools method of that device, it  
ought to forestall a catastrophic failure. Faults recognized all  
through preventive upkeep are resolved throughout corrective  
protection that wants the gear to be shutdown in most instances  
2
009). CBM techniques are presently a essential focal point of  
protection and protection administration lookup due to the  
aforementioned traits and challenges, improved complexity in  
industrial applied sciences (Swanson, 1997), and advances in  
circumstance monitoring strategies that encompass the use of  
on-line structures (Oberholster, 2009).  
3 Methodology  
The methodology followed in this study is about is  
accumulating the required records from actual oil  
manufacturing strategies and oil enterprise methods and on the  
whole from the Kuwait Oil Company ( KOC) preservation  
operations which will encompass all renovation operations for  
tanks, pumps, pipelines and different services used in the  
manufacturing of crude oil and associated operations (Al-  
Azmi, 2014). From the company's figures and data, KOC's  
personnel numbered 7, ninety four till the cease of fiscal 12  
months 2012. About 80.2% of Kuwaitis versus a goal of 49.4%  
per annum. (This wide variety does now not consist of clinical  
and nursing staff). Kuwait Oil Company (KOC) launched the  
Mobile Training Center in cooperation with an American  
organization specializing in oil and gas, as properly as oil  
subject offerings and complete assignment integration. KOC  
(
Olose, 2016). As phase of the MRP program, deliberate  
inspections on pipelines, vessels and constructions by way of  
equipped inspectors need to be finished primarily based on their  
preservation strategies. These ought to consist of degree one  
and two inspections for corrosion on pipelines, vessels and  
structures. The goal right here is to make certain equipments’  
reliability and availability (Olose, 2016). Mitchell (2018)  
furnished the technicians and engineers with some realistic  
recommendation and guidelines that can be used in the subject  
for widely wide-spread servicing, or when some ‘on the job’  
has additionally prepared  
application in cooperation with the greatest American  
universities specializing in enterprise administration so that  
a management improvement  
1564  
Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1563-1567  
contributors can be recognized with the brand new  
administration structures and current using abilities  
The availability of KOC equipment by assuming that such  
equipments work for 8 hours daily which means 2920 hrs. in  
the year. Depending on this assumption and data collected the  
availability of KOC equipments can be calculated and tabulated  
in table 2 below. Figure 1 shows the availability of studied  
devices at KOC company in 2019. It can be noticed that the  
availability of oil company (KOC) is high for most of them with  
exclusion of four devices that are: heater, CBCRU, Recycle  
Pump and Manturbo CRU. To improve their availability, the  
maintenance plan suggested by the KOC is Zero S/D PM  
Strategy or Philosophy which is Preventive Maintenance  
carried out by minimizing the Production Cut or in other word  
maximizing the “Facility up Time” with prime focus on Safety,  
Reliability & Integrity of Plant Equipment, Figure 2 shows the  
flow chart of this PM philosophy (KOC, 2019). If such plan is  
followed the availability of such devices will be improved to be  
more than 95%.  
(
Almunaifi, 2017).  
4
Data Collected  
The current applied maintenance technique followed in  
KOC is Reliability Centered Maintenance (RCM) which  
applied for critical/semi critical rotating equipment. The  
Availability values calculated for direct indicator of the asset  
performance are presented here. Increased maintenance focus  
on the less available equipment will be helpful to reduce  
production loss, thus improving the operation efficiency (KOC,  
2
109).  
Table 1: EK-I, Equipment Failures % (KOC, 2019)  
Equipment name  
Heater  
CB CRU  
Percentage of failure  
19%  
17%  
14%  
11%  
9%  
Table 2: EK-I, Equipment availability hours (KOC, 2019)  
Recycle Pump  
Equipment name  
Heater  
CB CRU  
Availability (hrs/year)  
2365.2  
2423.6  
2511.2  
2598.8  
2657.2  
2715.6  
2774  
Manturbo CRU  
RUSTON Turbine  
VSM Pump  
7%  
Recycle Pump  
DSL Train  
5%  
Manturbo CRU  
RUSTON Turbine  
VSM Pump  
Wash water pump  
Effluent water dispatch pump  
Air compressor  
Desalted feed pump  
LP wet separator  
Effluent water feed pump  
HP wet separator  
Transit pump  
5%  
3%  
2%  
2%  
2%  
2%  
1%  
1%  
DSL Train  
Wash water pump  
Effluent water dispatch pump  
Air compressor  
Desalted feed pump  
LP wet separator  
Effluent water feed pump  
HP wet separator  
Transit pump  
2774  
2832.4  
2861.6  
2861.6  
2861.6  
2861.6  
2890.8  
2890.8  
2890.8  
2909.3  
2914.2  
HP dry separator  
LP dry separator  
LP test separator  
1%  
0.4%  
0.2%  
HP dry separator  
LP dry separator  
LP test separator  
5
Results and discussion  
Figure 2: Zero S/D PM strategy of KOC (KOC, 2019)  
1565  
Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1563-1567  
Availability of KOC equipment -2019  
100%  
9
8
7
6
5
4
3
2
1
0%  
0%  
0%  
0%  
0%  
0%  
0%  
0%  
0%  
0%  
Equipment  
Figure 1: Availability of KOC equipments -2019  
6
Conclusions  
Competing interests  
The authors declare that there is no conflict of interest that  
would prejudice the impartiality of this scientific work.  
This study concentrated in the failures occurred in one of  
most important oil company in Kuwait, and the protection  
elements dealing with oil manufacturing zone in Kuwait and  
concentrates on KOC. The manufacturing methods face many  
troubles and equipments uncovered to many working  
stipulations which might also reason failures. Such screw ups  
influences the manufacturing quotes and in most of instances  
may also stopping the manufacturing process. In this find out  
about the CB compressor is studied, its operation, failure rate,  
its results on the universal machine and its disasters are  
investigated and analyzed. The moves recommended with the  
aid of the protection group are studied, analyzed and evaluated.  
A counseled preservation layout is cautioned through this learn  
about inclusive of a complete factors for all elements of CB  
compressor protection necessities which will minimize failure  
price of GCs equipments by means of 75% and enhance  
equipments availability to extra than 95%.  
Authors’ contribution  
All authors of this study have a complete contribution for  
data collection, data analyses and manuscript writing.  
References  
Al-Azmi S. ( 2014). The Kuwait Digest. stwww.kockw.com.  
Alfadly A. (2011). Kuwait National Petroleum Company (KNPC)  
Marketing Strategy in Oil Sector. International Journal of  
Marketing Studies Vol. 3, No. 1.  
Al-Munaifi B. (2017). : KOC Sharing Best Practices Conference.  
5th Edition of a Successful Experience”  
Barringer P. & P.E (2004). Process and Equipment Reliability.  
Maintenance & Reliability Technology Summit, Chicago, IL, May  
25, 2004.  
Bloch, H. P. (2000) Practical Lubrication for Industrial Facilities.  
Lilburn, Ga: The Fairmont Press.  
Ethical issue  
Authors are aware of, and comply with, best practice in  
publication ethics specifically with regard to authorship  
(
avoidance of guest authorship), dual submission, manipulation  
of figures, competing interests and compliance with policies on  
research ethics. Authors adhere to publication requirements  
that submitted work is original and has not been published  
elsewhere in any language.  
Elgsæter, S. M., O. Slupphaug, et al., (2010,)."A structured approach  
to optimizing offshore oil and gas production with uncertain  
models," Computers & Chemical Engineering, 34(2), 163-176.  
Elwerfalli A, Khan M., and. Munive J.(2016). A new methodology for  
improving TAM scheduling of oil and gas plants. Proceedings of  
1566  
Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1563-1567  
the World Congress on Engineering 2016 Vol II WCE 2016, June  
2
9 - July 1, 2016, London, U.K.  
Groysman A. (2017). Corrosion problems and solutions in oil, gas,  
refining and petrochemical industry. Koroze a ochrana materiálu  
6
1(3) 100-117  
Heng, A., S. Zhang, et al., 2009, "Rotating machinery prognostics:  
State of the art, challenges and opportunities," Mechanical  
Systems and Signal Processing, 23(3), 724-739.  
KOC ( 2019).Second Quarter Availability Reports- (JUL-SEP) 2018-  
2
019.  
Kuwait Oil Company (KSC). (2019). Maintenance Support  
&
Reliability Team (S&EK). Root Cause Analysis Report on CB-  
CRU Lubrication No/Low Flow Trips.  
Ministry of oil-Kuwait Annual report, 2018.  
Mitchell M. (2018). Oil and Compressor Lubrication. Unicla  
International Limited. www.unicla.hk.  
Oberholster, A. J. and P. S. Heyns, 2009, "Online condition monitoring  
of axial-flow turbo machinery blades using rotor-axial Eulerian  
laser Doppler vibrometry," Mechanical Systems and Signal  
Processing, 23(5), 1634-1643.  
Olose E. O. (2016). Effective Maintenance and Reliability Program in  
the Production of Crude Oil and Natural Gas. International Journal  
of Scientific & Engineering Research, Volume 7, Issue 2.  
Rahim, Y., I. Refsdal, et al., (2010). "The 5C model: A new approach  
to asset integrity management," International Journal of Pressure  
Vessels and Piping, 87(2-3), 88-93.  
Ratnayake R.M. (2012). Challenges in Inspection Planning For  
Maintenance of Static Mechanical Equipment On Ageing Oil And  
Gas Production Plants: The State Of The Art. Proceedings of the  
ASME 2012 31st International Conference on Ocean, Offshore  
and Arctic Engineering OMAE2012 July 1-6, 2012, Rio de  
Janeiro, Brazil.  
Maintenance.  
(2018).  
Schäuffele, J. (2005). Automotive software engineering: principles,  
processes, methods, and tools / Jörg Schäuffele, Thomas Zurawka  
;
translated by Roger Carey. SAE International.  
Stevens P. (2008). Kuwait Petroleum Corporation: Searching for  
Strategy in a Fragmented Oil Sector. Program on Energy and  
Sustainable Development Freeman Spogli Institute for  
International Studies Stanford University.  
Swanson, L., 1997, "An empirical study of the relationship between  
production technology and maintenance management,"  
International Journal of Production Economics, 53(2), 191-207.  
Telford S,, Mazhar M. and Howard I. (2011) Condition Based  
Maintenance (CBM) in the Oil and Gas Industry: An Overview of  
Methods and Techniques Proceedings of the 2011 International  
Conference on Industrial Engineering and Operations  
Group.  
Retrieved 3  
February 2014.  
Urbanism". Portal 9. Retrieved 7 December 2013.  
Treadgold, T., 2010, "Production Costs Paramount - The Game has  
2
014. Retrieved 4 January 2016.  
1567