Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1352-1356  
J. Environ. Treat. Tech.  
ISSN: 2309-1185  
Journal web link: http://www.jett.dormaj.com  
https://doi.org/10.47277/JETT/8(4)1356  
Vehicles Maintenance Workshops Layout and its  
Management to Reduce Noise Pollution and  
Improve Maintenance Quality  
1
2
Hesham Almomani *, Naser Almutairi  
1
Department of Industrial Engineering, Faculty of Engineering, the Hashemite University, Kuwaut  
2
Kuwait Municipality, Kuwait  
Received: 06/01/2020  
Accepted: 13/04/2020  
Published: 20/09/2020  
Abstract  
Most of vehicle maintenance in Arab world and Jordan is random with low share of management control, this system making  
maintenance of vehicles going on with low reliability. The need for managing maintenance operations and workshops layout of  
maintenance workshops and reduce noise pollution is crucial. The aim of this paper is to show the importance of maintenance  
management and vehicles maintenance workshops management and workshops layout in reduce noise pollution and improving the  
operations of maintenance of automobiles. The observations and collecting data about status of maintenance of vehicles workshops in  
Jordan is used here. Data and figures about the current status of some studied workshop is presented here. A suggestion for new and  
multi alternatives for workshop layouts are analyzed depending on Mean Time TO repair (MTTR). It is found that improving  
management methods and maintenance workshops layout will reduce noise pollution and improve the maintenance operations type and  
decreasing MTTR for failures. MTTR, costs and quality of maintenance are important factors affected by the maintenance of vehicles  
workshop layout, as the layout is arranged in good and flexible way the system becomes better and MTTR decreases.  
Keywords: Maintenance, Workshops, Layout vehicles, MTTR  
1
Introduction1  
2 Daily Inspection (DI)  
Automobiles need maintenance from time to time.  
It is the accountability of  
a
driver or proprietor of  
following inspection  
Like human beings are required to keep hygiene, in a similar  
fashion motors additionally want to be stored clean.  
Automobiles have to run on soiled roads and in a polluted  
environment. They run on uneven roads with potholes  
and different obstructions, and are consequently subjected  
to masses which injury them.  
a want for normal preservation and servicing of automobiles,  
which is typically carried out in auto workshops or  
an automobile to lift out  
the  
and exams daily, before beginning the engine, to keep away  
from any kind of breakdown on the road. (i) Check  
tire stress in all the tires visually or with the aid of hitting the  
tire wall with the assist of a stone and decide the sound (ii)  
Check the radiator’s coolant degree (iii) Check the fan belts for  
looseness (iv) Check the degree of engine oil (v) Check the  
windscreen, rear-view reflect and rear-window glass for their  
cleanliness [1].  
Therefore,  
there  
is  
auto provider stations.  
a car protection manual.  
Every  
new car comes  
with  
The proprietor of  
the automobile is anticipated to examine and use this manual,  
as it mentions car preservation pointers at some stage  
in driving. It has been observed that after getting an auto or  
vehicle, the proprietors do no longer care a good deal about  
3
Maintenance Check-up  
When one plans a lengthy distance travel, it  
is imperative to elevate out a hobbies check-up. One need  
to examine the automobile renovation guide for  
Some necessary check-ups  
are accomplished for higher maintenance. (i) Topping of oil  
level; (ii) Proper tension of belt; (iii) Battery for cleanliness and  
level of electrolyte (add only distilled water for topping of  
electrolyte water); (iv) Brakes; (v) Topping up of coolant, if  
required, in the coolant reservoir; (vi) Checking the  
serviceability of cooling system hoses; (vii) Proper tyre  
inflation pressure; and (viii) Air conditioning.  
clarity.  
a normal vehicle or automobile maintenance.  
the proprietors often carrier their  
the automobile protection recommendations given  
the automobile preservation guide will  
Even  
if  
vehicle,  
in  
increase the sturdiness or lifestyles of  
the automobile to  
a super extent. Vehicle protection and servicing is carried out  
when the car completes sure kilometers on its ordinary going  
for  
walks or  
when  
the car does no  
longer provide appropriate performance. It is counseled that  
the car proprietors raise out ordinary and periodical exams on  
their vehicle, some of which are referred to under [1, 2].  
4
Tips to Extend the Life of a Vehicle  
Care  
and protection maintain the automobile operating in correct co  
ndition. The following tips assist in higher renovation of  
a
Corresponding author: Hesham Almomani, Department of Industrial Engineering, Faculty of Engineering, the Hashemite University.  
E-mail: heshamalmomani@hu.edu.jo  
1
352  
Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1352-1356  
vehicle, and ought to be discovered in daily life. (i) drive the  
vehicle with care every day; (ii) be patient during the accident  
or breakdown of a vehicle, call helpline number of vehicle; (iii)  
buy petrol from reputed and trustworthy service stations; (iv)  
do not fill up fuel if your vehicle is parked around an oil tanker;  
safety. Globally thousands and thousands of motors are  
produced annually. These automobiles want preservation and  
restore as the want can also be. Statistics exhibit that, in the US,  
over 75% of all jobs, of which the motor car maintenances and  
restore is an quintessential part, is in the offerings sector. The  
carrier quarter additionally creates over 85% of newly-created  
jobs in the U.S. Over 60% of the Gross National Product (GNP)  
of the U.S is similarly generated via the offerings sector. In  
creating nations such as Brazil 54.5% of GNP is generated via  
the offerings region (Cauchick, Miguel Salomi, 2004). In  
Malaysia, about 58% of financial things to do in phrases of cost  
are from the offerings area (Elistina & Naemah, 2011). The  
motor car enterprise in South Africa offers with over 30  
manufacturers on the market and over one thousand mode  
versions (Anon, 2006). Foster (2006) then again reordered forty  
two manufacturers in South Africa with over 1200 mannequin  
variants, developing 10,000 jobs. The motor automobile  
enterprise in South Africa consequently contributes about 7.6%  
to the GNP of the USA [2].  
The gadget of preservation and restore works randomly,  
with overload or below load, violating techniques - selection  
rules. A specific challenge in making choices is due to the  
reality that in the passenger park there are extra than a hundred  
automobiles of more than a few capacities. The most  
complicated graph of buses consists of many components of  
units, units, the carrier nomenclature of which exceeds dozens  
of operations. In turn, the upkeep and restore complex, the most  
complicated queuing system, consists of a multitude of  
(v) Car keychain should be light; (vi) Preserve the car during  
long-term storage (vii) clean the inside too; (viii) clean dash  
gauges carefully; (ix) preserve door and window seals; (x) do  
not carry too much load (xi) use upholstery cleaners on soiled  
seats; (xii) place a towel under baby seats; (xiii) protect car  
paint from the sun by parking it in a spot that is out of direct  
sunlight. You can also apply high-quality wax as it prevents sun  
damage to car paint from ultraviolet radiation (xiv) Maintain  
proper tire inflation; (xv) Check for uneven wear; (xvi) Rotate  
your tyres; (xvii) Get wheel alignment checked; (xviii) top off  
brake fluid; (xix) care for anti-lock brakes; (xx) check engine  
oil at every other fill-up; (xxi) change oil frequently; (xxii) do  
not mix coolants; (xxiii) avoid hose hassles; (xxiv) check drive-  
belt tension; (xxv) clean your engine; (xxvi) keep the AC  
functional, even occasionally during winters; (xxvii) maintain  
your car’s battery; (xxviii) seal a leaky radiator; and (xxix)  
dilute your coolant [1].  
5
Vehicle service procedure  
Additionally one  
have observed that licensed car carrier facilities undertake pos  
itive processes for the duration of the carrier of a vehicle. In  
this session, we will talk about the frequent things to do carried  
out in the carrier center. One of the most vital phase is job card  
and its filling procedure.  
subsystems,  
fashions  
of regulatory,  
informational,  
organizational, technological and monetary support. Therefore,  
these days it is tough to think about the method of  
administration and decision-making besides the availability of  
records applied sciences for digitizing the manifestation of  
random events, for developing regulatory technologies,  
accounting and manipulate systems, and technological know-  
how to motivate employees to make bigger productiveness and  
satisfactory of work in the upkeep and restore system. Research  
and enhancement of methods, strategies of administration and  
making sure a excessive degree of reliability, durability, safety,  
and affectivity of MTE and motor motors (MV), which include  
the use of records technologies, are carried out through  
scientists from more than a few fields of transport, data applied  
sciences and different areas. However, the introduction of such  
administration schemes and software program merchandise  
aimed at the renovation (prevention) device of the automobiles  
is instead restrained and as a result, in some enterprises, the  
report glide is fashioned solely in paper form, which  
complicates data evaluation tactics [3-9].  
6
Common Activities in the Workshop  
(
(
(
(
(
(
(
(
i) Job card and its filling procedure  
ii) Washing of vehicle and Washing Procedure  
iii) Engine minor tune up  
iv) Oil replacement  
v) Checking of battery electrolyte level and top-up  
vi) Clutch and brake-free play and their adjustment  
vii) Lighting system, its various parts and their checking  
viii) Identification of greasing points of wheelers and  
procedure of greasing  
(
[
ix) Checking of tyre inflation and procedure of inflation  
1].  
7
Job Card and Its Filling Procedure  
When a car proprietor enters the carrier center, he or she is  
attended by means of the supervising engineer. The consumer  
informs about the automobile defect. After getting comments  
from the automobile proprietor or driver related to defects of  
the vehicle, the supervising engineer in a provider station or  
workshop inspects it. The defects pointed out or listed are stated  
down in a general format, which is known as the job card or  
work order. In order to point out his pleasure with the prognosis  
made with the aid of the supervising engineer, the client of the  
automobile symptoms the job card earlier than the repairs on  
the car are started. Work is then assigned to the worried  
individual to lift out repairs and the supervisor signs and  
symptoms the job card too. The work order or job card is  
organized replica [1]. Motor motors want to be frequently  
maintained and repaired when essential in order to make certain  
vehicular health, toughness as properly as human and car  
The answer for growing overall performance of  
preservation workshops of cars is represented through  
developing a correct workshop diagram like that in determine  
1
below. The design format of the facility now proceeds  
specifying the place of automobile hoists, required offerings  
such as oil reticulation, compressed air supply, water provide  
and waste oil services. All unique measurements will be  
mentioned in relation to places of equipment, such as  
automobile hoists, to allow the correct documentation of  
electricity and different operational provider needs. The  
diagram offers you the client, a visible effect of the structure  
the carrier workshop will take after thinking about all elements  
preferred to grant the superior end result in the area available.  
1
353  
Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1352-1356  
Figure 1: The modern and standard maintenance workshops layout [12]  
Additionally, we can furnish a CAD drawing giving a  
greater full point of view of the layout. The achieved graph  
sketch is correctly a working drawing to hand over to the  
builder, electrician, plumber etc. Figure 1 indicates one of the  
contemporary amenities or workshops design [12]. A devoted  
hose reel should be used for every kind of fluid, motor oil,  
equipment oil, compressed air, grease, water, etc. A appropriate  
manage valve is then related to every hose end. In the case of  
lubricants, manipulate valves consist of a volumetric meter  
with partial register for controlling the extent of oil delivered at  
every provider and a totalizer to point out the whole quantity of  
oil dispensed. Hose reels can be floor, wall or ceiling set up and  
can additionally be established inside lubrication pits, for  
convenient get right of entry to greasing factors and tools oil  
fills. A shut off valve ought to be established between each and  
every hose reel inlet hose and the fluid distribution line. Other  
tools to think about in the working region are cell waste oil  
drainers and cellular devices for the distribution of grease and  
lesser used lubricants [12]. Layout is an integral part of a Lean  
Manufacturing and Maintenance Strategy. Meaningful re-  
structuring requires corresponding physical changes in the  
layout. Conversely, a layout re-design can be the catalyst for  
space plan: (a) space planning units (aka Activity Areas or  
SPUs), (b) affinities, (c) space, (d) cSonstraints. Levels of  
Detail help organize facility planning into manageable sub-  
projects. Each sub-project has a series of tasks that the design  
team must complete. The tasks and their sequence differ for  
each level. These levels are: (I) global (Site Location), (II)  
supra (Site Planning), (III) macro (Building Layout), (IV)  
micro (work cell/department layout), (V) sub-micro  
(workstation design), and elements of a plant or facility layout.  
Every layout has four fundamental elements: Space Planning  
Units (SPUs), Affinities, Space and Constraints. These  
fundamental elements apply to any size facility and at any level.  
Just as a few chemical elements give rise to an infinite number  
of compounds, the four layout elements and their variations can  
produce an almost infinite number of factory layouts [10-12].  
•SPUs combine with Affinities to form an Affinity  
Diagram. The Affinity Diagram is an idealized spatial  
arrangement that eventually becomes a layout.  
•Each SPU requires some finite space whether great or  
small. Space, added to the Affinity Diagram, distorts it into  
the Layout Primitive.  
•Constraints are conditions, assumptions, policies or edicts  
that restrict the design is some way. For example, "The  
layout must fit into the existing building." Constraints  
further modify the spatial arrangement and a Macro- layout  
results.  
re-structuring.  
A
layout project, properly done, can  
demonstrate the need for change to an organization reluctant to  
tear itself apart and rebuild.  
Product-Focused work cells  
Focused Plant-Within-Plant Factories  
Reduced Storage & Handling Space  
Kanban Stock points  
Direct Delivery of Raw Materials  
Integrated Support Areas  
9
Levels of Facility Planning  
Factory layout is the focal point of facility design. It  
dominates the thinking of most managers. But factory layout is  
only one of several detail levels. At Strategies, we find it useful  
to think of facility planning at five levels: (I) global (Site  
Location); (II) supra (Site Planning); (III) macro (Building  
Layout); (IV) micro (Work cell/Department Layout); and (V)  
sub-Micro (Workstation Design). At the Global level, we pick  
out a website online location. This entails elements such as  
freight cost, labor cost, talent availability and web site focus.  
At the Supra-Layout degree we format the site. This consists .  
8
Facility Planning Series  
The links below take you to a series of pages that  
summarize the basics of Facility Planning and Plant Layout.  
Four fundamental facility elements go into every layout or  
1
354  
Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1352-1356  
of number, size, and vicinity of buildings. It consists of  
infrastructure such as roads, water, gasoline and rail. This  
diagram have to seem in advance to plant expansions and  
eventual web site saturation The Macro-Layout plans every  
building, shape or different sub-unit of the site. Operating  
departments are described and positioned at this level.  
Frequently, this is the most necessary degree of planning. A  
Macro-Layout group The Micro Level IV determines the  
region of particular gear and furniture. The emphasis shifts  
from gross cloth float to private house and communication.  
Socio-Technical issues dominate. The sub micro degree  
focuses on person workers. Here we format workstations for  
efficiency, effectiveness and safety. Ergonomics is key.  
Ideally, the sketch progresses from Global to Sub-Micro in  
distinct, sequential phases. At the stop of every phase, the plan  
is "frozen" by way of consensus [12, 13, 15]. Layout is  
complicated by multiple often competing objectives such as  
minimize investment in equipment, minimize overall  
production time, provide for employee/customer convenience,  
maintain flexibility of arrangement/operation, minimize  
material handling cost, utilize existing space most efficiently,  
and can have a huge effect on productivity [12, 14]  
5
5
5
4
1
1
2
4
1
1
2
2
3
3
3
3
a
5
5
5
1
4
4
1
1
2
2
2
1
3
3
3
3
b
Figure 2: a, b the suggested layouts for the workshop  
It can be noticed that the first alternative is better since  
department no.4 is connected with two adjacent important  
departments (+0.1), more flexible (+0.1) and having  
dependency between departments lower than alternative 2  
+0.1) which means that MTTR is lower by 30% than layout 2.  
Figure 3 shows a comparison between the two alternatives  
depending on MTTR.  
(
1
0 Methodology  
The data is collected from a random vehicle large workshop  
(
Rashad maintenance workshop-Swaieleh-Jordan), it executes  
1
00%  
0%  
80%  
0%  
60%  
maintenance works randomly, it presents maintenance  
operations to about 100 automobiles/day, having about 15  
technicians). The works of such workshop is random, no queue,  
no management and no fixed prices for same works. This  
workshop is disorder has many problems with customers and  
no regular policy. This study aims to classify and re-layout of  
the workshop. And also in this work the effects of layout on  
mean time to repair (MTTR) and faults is studied. One of  
suggestions studied is to rearrange the studied vehicle  
maintenance workshop to have 5 departments with the  
following specifications-Table 1.  
MTTR  
9
7
5
4
3
2
0%  
0%  
0%  
0%  
Table 1 Data collected  
Area  
10%  
0%  
Department Dept. Name  
Tiles  
2
(
m )  
MTTR alternative 1  
MTTR alternative2  
1
2
3
Engine  
Brake and wheels services  
Gear  
8
6
8
4
3
4
Figure 3: MTTR for layouts alternatives  
Reception and customer  
services and spare parts  
Exhaust and radiator  
It can be noticed from figure 3 that MTTR in the case of  
more accurate and flexible and low dependency layout is better,  
the vehicles needs lower time for maintenance and repair.  
4
4
6
2
3
5
2
Each tile is 4 m  
1
2 Conclusions  
1
1 Results and discussion  
The task here is to select between many alternatives of  
Layout and facility planning play a vital role in improving  
automobiles maintenance operations, the better layout of the  
workshop improving maintenance operations by reducing  
MTTR and quality of maintenance and also costs.  
layouts. In this study the main base to select the best alternative  
is MTTR. The best alternative is the layout offers min MTTR.  
This will be achieved depending on the relation between  
maintenance department, spare parts location, workers moving  
between departments and size of departments. For the two  
following suggested layouts, MTTR is calculated and  
compared. The dependency of department will be considered  
as follows: (1, 2):0.25; (1, 3):0.7; (1, 4):0.9; (1, 5):0.9;  
Ethical issue  
Authors are aware of, and comply with, best practice in  
publication ethics specifically with regard to authorship  
(avoidance of guest authorship), dual submission, manipulation  
of figures, competing interests and compliance with policies on  
research ethics. Authors adhere to publication requirements  
that submitted work is original and has not been published  
elsewhere in any language.  
(
2,3):0.6; (2,4):0.9; (2, 5):0.25; (3,4):0.9; (3, 5):0.25; (4, 5):0.9.  
If cars go from left to right the alternative number 1 has more  
fexibility than two since the reception and customer services is  
in a good position and so it needs less time to be classified and  
maintained. The dependency of alternative  
0
0
1
is:  
.9*0.9*0.6*0.25=0.1215. The dependency of alternative 2 is  
.7*0.9*0.25*0.9=0.14175.  
1
355  
Journal of Environmental Treatment Techniques  
2020, Volume 8, Issue 4, Pages: 1352-1356  
Competing interests  
The authors declare that there is no conflict of interest that  
would prejudice the impartiality of this scientific work.  
Authors’ contribution  
All authors of this study have a complete contribution for  
data collection, data analyses and manuscript writing.  
References  
[
1] CLASS IX. AUTOMOTIVE SERVICE TECHNICIAN Germany.  
2
019.  
[
2] Bulgakov NF, Kovalenko VV, Gorbaneva AV, Shalimov SN.  
Management of preventive maintenance of vehicles. InIOP  
Conference Series: Materials Science and Engineering 2019 Oct  
(Vol. 632, No. 1, p. 012074). IOP Publishing.  
[
[
3] Bulgakov N F, Burkhiev TS. Quality management protection MV.  
Modeling and optimization (Krasnoyarsk: KGTU). 2002:164  
4] Bulgakov NF, Kovalenko VV. Information support technology in  
the vehicle prevention regulations J. of the Siberian Federal Univ.  
Ser.: Eng. and Technol. 2013;6(2):203210  
[
[
5] Postolit AV, Vlasov VM, Yefimenko DB. Informatsionnoye  
obespecheniye avtotransportnykh sistem [Information support of  
motor transportation systems]. Moscow, MADI Publ. 2004.  
6] Sushchev AA. Improving the quality management of car service  
based on the application of new information technology,  
Dissertation. 2010.  
[
[
7] Senra P, Lopes I, Oliveira JA. Supporting maintenance scheduling:  
a case study. Procedia Manufacturing. 2017 Jan 1;11:2123-30.  
8] Okoh C, Roy R, Mehnen J. Predictive maintenance modelling for  
through-life engineering services. Procedia CIRP. 2017 Jan  
1
;59:196-201.  
[
[
9] Schuh G, Jussen P, Optehostert F. Iterative Cost Assessment of  
Maintenance Services. Procedia CIRP. 2019 Jan 1;80:488-93.  
10] Bulgakov NF, Kovalenko VV, Gorbaneva AV, Shalimov SN.  
Management of preventive maintenance of vehicles. InIOP  
Conference Series: Materials Science and Engineering 2019 Oct  
(Vol. 632, No. 1, p. 012074). IOP Publishing.  
[
11] Bulgakov NF, Kovalenko VV, Sirenko LN, Sysoev MA. Model of  
statistical evaluation of the characteristics of reliability and  
efficiency Certificate of computer program registration.  
2
007;20067613059.  
[
[
12] Alemlube reports. Automotive Workshop Design Equipment  
Installation. Australasia. 2018.  
13] Ahmad I, Ahmad S. The Mediation Effect Of Strategic Planning  
On The Relationship Between Business Skills And Firm’s  
Performance: Evidence From Medium Enterprises in Punjab,  
Pakistan. Opcion. 2019;35(24):746-78.  
[
[
14] Ahmad I, Ahmad S. Multiple Skills and Medium Enterprises’  
Performance in Punjab Pakistan: A Pilot Study. Journal of Social  
Sciences Research. 2018; Special, (4):44-9.  
15] Ahmad, I., Sahar. Waste Management Analysis From Economic  
Environment Sustainability Perspective. International Journal Of  
Scientific & Technology Research. 2019; 8(12), 1540-1543.  
1
356